Articles tagged with: himalayan engineering

J-K: Speed trial conducted on Katra-Banihal railway section of Udhampur-Srinagar-Baramula Rail Link

Reasi, January 8: A satisfactory speed trial was conducted on the Katra-Banihal railway section of the Udhampur-Srinagar-Baramula Rail Link (USBRL) during the Commissioner of Railway Safety (CRS) inspection on Wednesday.


Articles tagged with: himalayan engineering